In 2007 BSIE was awarded a contract to aid in the separation of drain lines at the Terminal B parking lot at Logan airport. The goal of the project was to install four oil/water separators in the immediate future and eventually to completely separate the drainage system, eliminating the flow of oil into Boston Harbor. BSIE provided QL-A and B quality information as defined by CI/ASCE 38-02 standards on this project in order to avoid any conflict of the new proposed drainage with existing underground utilities. QL-B electronic utility designation was utilized by engineers, providing an accurate horizontal location of the utilities in question. All survey performed was to Massport control.

Once reviewed by a professional engineer, BSIE engineers worked in collaboration with those from our client t to determine the best locations to obtain QL-A information as defined by CI/ASCE 38-02. Vacuum excavation was performed to obtain exact vertical and horizontal limits of telephone and electric duct banks, as well as the size and location of water lines at approximately 50 data points throughout the lower level of the terminal B parking garage. The data gathered in this manner was then compiled and submitted to our client, from which they prepared a construction plan to meet their project goals. BSIE performed all work on overnight shifts to accommodate the traffic situation at Logan airport.

Contact one of BSIE’s skilled and experienced engineers today to see how your project can benefit from your relationship with BSI Engineering.
 
  Supporting Documents TERMINAL-B 1 TERMINAL B COVER
    TERMINAL-B 2    
   Please note that you will need Acrobat Reader in order to view these documents.