VEOLIA Steam Duct

  • Recent Projects VEOLIA Steam Duct

About the Project

BSI provided quality level A, B, C and D information for a proposed steam duct bank alignment along a 1 mile of urban arterial roadway running through utility congested urban streets of Boston and Cambridge, MA. BSI performed all QL-C survey and QL-B electronic designation services for the entire mile alignment with quality level A vacuum excavations for utility location, as well as monitoring well installation and soil sampling.

Untitled Document